Committed to Quality. Dedicated to Safety.

Every stage of construction on the Satai Ghat–Chowka corridor is executed and verified against MoRT&H specifications, IRC codes and NHAI’s Concession Agreement requirements.

Quality assurance

A dedicated site laboratory, on every stretch

A fully equipped material testing laboratory is established at the project Base Camp (Ch. 120+900). All borrow-area soil, aggregates, cement, GSB, WMM and concrete works are tested here before and during execution, in line with the Quality Assurance Plan submitted to the Authority / Independent Engineer.

Each construction activity is checked and verified through Requests for Inspection (RFIs) raised by the Concessionaire and reviewed by the Independent Engineer — M/s Chaitanya Projects Consultancy Pvt. Ltd. J/V M/s Geo Designs & Research Pvt. Ltd. — before work proceeds to the next stage.

  • Material qualification testing: soil, aggregates, cement & reinforcement steel
  • Mix design approval for PCC / RCC grades M-15 through M-35
  • In-process QC: field density, gradation, thickness & compaction checks
  • Independent Engineer review & approval of every RFI before progression
Site laboratory material testing team
Quality process

From material to finished pavement

Material Qualification

Borrow-area soil, aggregate & source approvals prior to use.

Mix & Method Approval

JMF, mix designs and construction methodology submitted for approval.

In-Process QC

Daily density, gradation, thickness & strength testing at site lab.

Independent Engineer Audit

RFI-based inspection and sign-off by the Authority’s Independent Engineer.

Defect Tracking

Non-conformances logged, tracked to closure through the Defect Liability & O&M period.

Approved sources

Materials & brands approved for the works

Cement (OPC 43/53 grade)
BrandStatus
Ultratech CementApproved
ACCApproved
JK CementApproved
MP Birla GroupApproved
Reinforcement steel (TMT)
BrandStatus
Rashmi Metaliks Ltd.Approved
Super ShaktiApproved
SAIL (SeQR TMT)Approved
Rama PowerApproved
Safety culture

Zero-Harm on every stretch

Traffic safety arrangements are maintained across all active work fronts — road signs, temporary barriers, reflective gunny-bag bunding and channelised diversions protect both the workforce and the travelling public throughout the 55.125 km corridor.

  • Mandatory PPE & daily toolbox safety briefings for all site personnel
  • Dedicated Safety Officer overseeing the project corridor
  • Sufficient road signs, barricades & reflective markers at active work zones
  • Accident report: Nil reported incidents to date
0Reportable accidents
1Dedicated Safety Officer
DailyToolbox safety briefings
55.125Km under safety watch
Standards followed

Codes & specifications

MoRT&H Specifications
IRC Codes of Practice
NHAI Concession Agreement
IS Codes (Materials & Testing)